Clarion-Limestone Students Design, Build New Trophy Case

2017 trophy case panoSTRATTANVILLE, Pa. (EYT) – Clarion-Limestone High School students designed and built a new trophy case.

Wood and Design Instructor Phil Pezzuti told exploreClarion.com, “Four years ago, our high school principal, Doug Rodgers, asked if our design class and woodworking class could design and build a display to hold our all state athletes.”

“That idea blossomed into a much larger project which was made possible financially by the Clarion-Limestone Educational Fund which was initiated by a donation by Ms. Betty H. Willison.”

Mr. Pezzuti gave the following students credit for the success of the project:

  • Levi Schreckengost (2015) was responsible for the the initial working drawing and material estimation.
  • The box construction was completed by Chuckie Lemelle, David Frampton, and Brandon Walters. (2016)
  • Millwork for the the cabinet frames were produced by Tyler Amsler, Chuckie Lemelle, and Amber Rawson. (2016)
  • Glazing, trim-work, and light installation was completed by Mac Park, Tyler McKinley, Connor Dame, Dan Rosenquest, Mike Macefe, and Matt Coleman.

“Our project would not have been possible without the help of Clarion Cabinetry, Glass Erectors, The Lighting Palace, and Curran Wood Products,” Mr. Pezzuti added.


Copyright © 2024 EYT Media Group, Inc. All rights reserved. Any copying, redistribution or retransmission of the contents of this service without the express written consent of EYT Media Group, Inc. is expressly prohibited.

Comments are temporarily closed. A new and improved comments section will be added soon.