Construction Complete for Mount Pleasant Road Bridge Project in Beaver Township


BEAVER TWP., Pa. (EYT) – The Mount Pleasant Road (Route 3003) bridge, which spans Beaver Run in Beaver Township, Jefferson County, that’s been under construction as part of the Pennsylvania Department of Transportation’s Rapid Bridge Replacement Project, is complete and open to traffic.

The bridge reopened to traffic on Friday, July 21.

Replacement work was performed by Walsh II Construction of Pittsburgh. The new crossing is longer and wider than the one it replaced and is designed with a 100-year lifespan.

This bridge is referred to as JV-394 and is one out of the 558 bridges being replaced under the Rapid Bridge Replacement Project. JV references the joint-venture partnership between Walsh/Granite, which is leading construction for the entire project.

The Rapid Bridge Replacement Project is a public-private partnership (P3) between PennDOT and Plenary Walsh Keystone Partners (PWKP), under which PWKP will finance, design, replace, and maintain the bridges for 25 years.

The P3 approach will allow PennDOT to replace the bridges more quickly while achieving significant savings and minimizing the impact on motorists, according to PennDOT.


Copyright © 2024 EYT Media Group, Inc. All rights reserved. Any copying, redistribution or retransmission of the contents of this service without the express written consent of EYT Media Group, Inc. is expressly prohibited.

Comments are temporarily closed. A new and improved comments section will be added soon.